Case Studies
Western Pump’s Featured Projects
-
CASE STUDY N538 MCCS Mini-Mall and Fueling Station (Twentynine Palms, California) Intro Project Description Western Pump collaborated with Halbert Construction Co. to design and construction of the MCCS Mini-Mall and Fuel Station at the Marine Corps Air Ground Combat Center in Twentynine Palms, CA. Western
-
CASE STUDY MCAS Miramar Auto Service Center (Miramar Air Station, California) Intro Project Description Western Pump, Inc. designed and built the entire fueling system for this new ground-up gas station, convenience store, and car wash project. Three 30,000– gallon, and one 15,000– gallon underground storage
-
CASE STUDY Chollas Creek Quaywall Fuel Tank Project (Naval Base San Diego, California) Intro Project Description This design and build marina fuel facility project included installing a 10,000-gallon two-compartment aboveground storage tank and double-wall piping systems down to a floating dock for gasoline and diesel
-
CASE STUDY Contractor Owned and Operated Automated Fuel Facility, Camp Pendleton, CA Intro Project Description As a subcontractor to Willbros, Western Pump constructed six new contractor owned contractor operated fueling facilities at MCB Camp Pendleton, CA. The project included twenty-five (25) underground storage tank systems,
-
CASE STUDY N246 Twentynine Palms Marine Mart - Ocotillo, Twentynine Palms, California Intro Project Description The new LA Metro Division 13 Bus Maintenance and Operations Facility stands as one of the most advanced transit facilities in the nation. It includes a maintenance facility with 19
-
CASE STUDY San Diego International Airport Rental Car Center Intro Project Description The consolidated rental car center (CONRAC) at the San Diego International Airport is a massive two-million square-foot structure. It houses 16 rental car companies, a customer service building, a quick-turn-around car prep facility
Contact Us