CASE STUDY

Chollas Creek Quaywall Fuel Tank Project (Naval Base San Diego, California)

Intro

Project Description

This design and build marina fuel facility project included installing a 10,000-gallon two-compartment aboveground storage tank and double-wall piping systems down to a floating dock for gasoline and diesel fuel dispensing into small craft vessels. The Department of Defense’s Unified Facilities Criteria requirements for petroleum fuel facilities were adhered to along with California Air Resource Board phase-I enhanced vapor recovery for above ground tanks.

Details

Scope of Work

Services Provided

Design/Build

Aboveground Storage Tank

Fuel Dispensing Systems

Electrical

  • Design & Engineering
  • Permitting 
  • Demolition/Removal/Disposal 
  • Excavation & Trenching 
  • Piping System Installation
  • Class I Division I & II Electrical
  • Monitoring System
  • Compliance Testing
  • Inspections
  • Project Close-out

Notable Accomplishments

The most significant challenge with this project was designing the piping systems to accommodate for the tidal fluctuations (minus 4 feet to plus 8 feet). This was accomplished through collaboration and teamwork with the piping system manufacturer, OmegaFlex, to custom design piping systems and cradles to hold the double-wall dock connectors in a safe manner during the rise and fall of the tides.

Annual Savings

500k

Return Users

12M

Sales Increase

20%

Traffic Boost

18%

Testimonial

“I can’t believe it took us this long to make a change. So happy that we did. Numbers don’t lie.”

Brian Lahr, Construction Manager

Contact Us

1-888-239-9988

Sales & Construction - info@westernpump.com

Request Service - dispatch@westernpump.com