CASE STUDY
MCAS Miramar Auto Service Center (Miramar Air Station, California)Intro
Project Description
Western Pump, Inc. designed and built the entire fueling system for this new ground-up gas station, convenience store, and car wash project. Three 30,000– gallon, and one 15,000– gallon underground storage tanks, and twelve fuel dispensers (24 fueling positions) were installed along with an 8,832-sq ft canopy structure with energy efficient LED lighting. Western Pump self-performed 100% of the fuel system mechanical and electrical design, permitting, equipment installation, construction, system testing, certification, and employee training.
Details
Scope of Work
Services Provided
Design/Build
Fuel Storage & Dispensing System
Canopy Structure
Electrical
- Design & Engineering
- Permitting
- Engineered Shoring
- Excavation & Trenching
- Tank Installation
- Electrical Installation
- Secondary Containment
- Enhanced Leak Detection Testing
- Piping System Installation
- Enhanced Vapor Recovery (EVR)
- Point-of-sale system installation
- Compliance Testing
- Inspections
Notable Accomplishments
Existing hard pan, caliche, and cobbles were encountered during excavation (the geotechnical report did not indicate this). Western Pump worked together with Haskell to mitigate the negative impacts on the project schedule by bringing– in additional heavy equipment and by negotiating a fair rate.
Annual Savings
500k
Return Users
12M
Sales Increase
20%
Traffic Boost
18%
Testimonial
“I can’t believe it took us this long to make a change. So happy that we did. Numbers don’t lie.”
Brian Lahr, Construction Manager
Government Point of Contact
Army IMCOM G-9 Contracting
General Contractor
The Haskell Company
Contact Us