CASE STUDY

N538 MCCS Mini-Mall and Fueling Station (Twentynine Palms, California)

Intro

Project Description

Western Pump collaborated with Halbert Construction Co. to design and construction of the MCCS Mini-Mall and Fuel Station at the Marine Corps Air Ground Combat Center in Twentynine Palms, CA. Western Pump designed and built the entire fuel system for this project. The system included three (3) 20,000-gallon underground storage tanks, six (6) multi-product fuel dispensers, a 4-column canopy structure with LED lighting, a monument price sign, a 3-terminal point-of-sale system, and a tank and continuous monitoring system.

Details

Scope of Work

Services Provided

Design/Build

Fuel Storage & Dispensing System

Canopy Structure

Electrical

  • Design & Engineering
  • Permitting
  • Engineered Shoring
  • Excavation & Trenching
  • Tank Installation
  • Electrical Installation
  • Secondary Containment
  • Enhanced Leak Detection Testing
  • Piping System Installation
  • Enhanced Vapor Recovery (EVR)
  • Point-of-sale system installation
  • Compliance Testing
  • Inspections

Notable Accomplishments

Western Pump’s design/build team worked together with Halbert Construction, NAVFAC, and the military’s general project architect to coordinate the design elements from the larger project into the fuel center.

A state-of-the-art fueling facility was built to comply with California regulations for enhanced vapor recovery and environmental compliance.

Annual Savings

500k

Return Users

12M

Sales Increase

20%

Traffic Boost

18%

Testimonial

“I can’t believe it took us this long to make a change. So happy that we did. Numbers don’t lie.”

Brian Lahr, Construction Manager

Government Point of Contact

NAVFAC Southwest Division

General Contractor

Halbert Construction Co., Inc.

Contact Us

1-888-239-9988

Sales & Construction - info@westernpump.com

Request Service - dispatch@westernpump.com